Skip to main content

Steinbach Credit Union

The newest addition to Manitobas largest credit Union is a new construction located in downtown Steinbach.  This multi-level bank is a cutting edge professional facility boasting offices in addition to the bank.

Access Fort Garry

ACCESS Fort Garry located at the Pembina Crossing Mall near Bishop Grandin Boulevard will be an inclusive health Centre providing many services to the community. Public and mental health services as well as children’s disability services to home care and nursing clinics. The new build will be an excellent addition to the areas social services.

Castle Garden

Castle Gardens is a new mid-rise residential building in Winnipeg.  This new property will be 6 floors with 150 units for dwelling. An underground parking facility is also part of this development.

Seine River Retirement Residence

Directly on the banks of the Seine River, this brand new retirement complex lies in the developing River Park South area. In addition to providing electrical in the complex and its 168 suites, Allco Electrical also provided the electrical work for the amenities such as the movie theatre, spa, workout facility, library and internet lounge. In addition, an emergency intercom system and heat/ smoke detectors were installed in each suite.

Parkland Recreational Complex

The Parkland Recreational Complex was an innovative project with a large spectrum of details involved. The construction aspect of the project included the addition of a brand new NHL-size arena pad, as well as the renewal and renovation of the existing one. Using newer and “greener” technologies, the new ice refrigeration system that was built also integrated the existing six curling sheets.

Pages