Skip to main content

Best Western Hotel

This Contract includes the construction of a six-storey hotel with 141 rooms, a bar, meeting rooms, fitness centre, a pool, a slide and a restaurant.  The project included fire alarm, lighting, lighting fixtures and data communications.

Sage Creek Building 4

The Project consists of the creation of a six storey building and 4-four storey buildings including distribution, emergency lighting, fixtures, fire alarm, enterphone system and electric heat as well as temporary power.

Merit Functional Foods

94,000 square foot plant protein processing facility. Food processing that will derive protein from both canola and peas from Manitoba producers. Distribution, switchboards, panelboards, transformers, duct bank and manholes, medium voltage cabling, cable bus, cable bus transition enclosures, parking lot receptacles, hand dryers, floor boxes, electric heating, fire alarm, lighting and lighting controls, emergency lighting, structured cabling, intrusion detection, video surveillance, access control.

Sage Creek School

This project is Winnipegs newest elementary school being built in the development of Sage Creek. This will be a state of the art school serving Kindergarten through grade 8.  This 68,000 square foot facility will have a 450-600 student capacity.

Heritage Landing

Located at 300 Assiniboine Ave on the Red River in Winnipeg, Manitoba a high rise that will change Winnipeg’s skyline.  This is a 25 story 410,000 square foot apartment complex with 215 suites, underground parking and several amenities

Pages